×

🎁 Don’t Miss Out β€” You Could Win £100

Enter today for your chance to win Β£100 + unlock exclusive cashback offers.

βœ” Free UK Delivery   βœ” 60-Day Returns   βœ” Rated Excellent

No spam. Just great deals.

 

Sales/Support

0203 195 3902

 

My Basket

Β£0.00

 
Multi Award-Winning Family Business
 
Hassle Free 60 Day Returns
 
Free UK Delivery
 
Spread the Cost
Brand:Epson / Data Projectors / Epson Data Projectors / Epson EB-U50
Epson EB-U50 | Quzo UK
  •  
    Brand New & Boxed
  •  
    Manufacturer Warranty
  •  
    Fast & Free Delivery
  •  
    Pay over 3 months 0% Interest*
Manufacturer Supplied Images - These images are supplied by the manufacturer, are provided as an illustration and may vary slighly. If you have any queries about this product, please contact us and we will be happy to help.
Save Β£338.76 (29%)
Product Code: 237018

Epson EB-U50 V11H952041

Β£840.23All prices include VAT
Β£1,178.99save Β£338.76
Sorry, temporarily out of stock, click the button below to be notified once it's available again.
2479 reviews
Highlights
  • Low TCO: Impressive lamp and filter life
  • Unobtrusive design: Discreet design suits most environments
  • Flexible: Designed to support many installation options
  • High-quality images: Bright and vivid imagery, thanks to 3LCD technology
  • Ease of use: Simple to install and easy to use
Seen this cheaper? If you have seen this product cheaper, we will do our best to match or better the price. Click here to submit a price match.
 
Warranty:Full Manufacturer- Initial Release Date: 01/07/2019
 
Return Policy:60 Days
 
Best Sellers Rank:159 in  Data Projectors
Description & Additional Information
Product Specifications
Downloads
Reviews

General Information for Epson Data Projectors

Epson EB-U50, 3700 ANSI lumens, 3LCD, WUXGA (1920x1200), 16000:1, 16:10, 1.1 - 11 m

EB-U50

EBU50 Projector

Digital signage projector

This white signage projector offers an inconspicuous design simple installation and operation and is ideal for retail galleries and museums.

A versatile 3700 lumens WUXGA-resolution digital signage projector that’s economical and space-friendly. It benefits from an understated clean white edge-free design that blends beautifully into most environments without distracting viewers from the content. Also its versatility and reliability provide users with many mounting options and fit-and-forget peace of mind.

Affordable

The most affordable device in Epson’s signage projector range. It's lamp-based (not laser) and boasts a low total cost of ownership (TCO). The lamps and filters have a longer life than other lamp-based projectors with a lamp life of 10000 hours in normal mode and 17000 hours in Eco Mode. The filter has a 10000-hour maintenance cycle.1

Image quality

3LCD technology ensures the projection of bright and vivid imagery./>
Easy to install and use

Low TCO runs through every element of the EB-U50… starting with the simplicity and flexibility of installation. It can be easily installed and attached to a lighting track ceiling mounted or used in a floor-standing position.2 The EB-U50 also rotates 360 degrees horizontally and 30 degrees vertically.

Unobtrusive design

The EB-U50 is space-friendly understated clean white edge-free and blends beautifully into most environments.

Flexibility

Epson Projector Content Manager Software allows quick easy set-up without specialist installation. Playback is PC-free (with built-in Wi-Fi) via a USB drive and can be changed using the remote control. The EB-U50 also includes multi-projection features to allow edge blending display scaled images adjust multiple projected images and synchronise playback.

Key Features

• Low TCO: Impressive lamp and filter life
• Unobtrusive design: Discreet design suits most environments
• Flexible: Designed to support many installation options
• High-quality images: Bright and vivid imagery thanks to 3LCD technology
• Ease of use: Simple to install and easy to use

Features
Brightness (Normal)3700 ANSI Lumens
Native resolution1920 x 1200
Aspect ratioWUXGA (16:10)
Contrast ratio (typical)16000:1
Technology3LCD
Lamp Life10000 Hours
Lens Throw Ratio1.38 - 1.68:1
Horizontal Keystone+/-30 Degrees
Vertical Keystone+/-30 Degrees
Wireless compliancyYes
USB 2.0 ports quantity1
HDMI ports quantity2
VGA (D-Sub) ports quantity2
RS-232 interface1
ColourWhite
Dimensions W x D x H364 x 87 x 248 mm
Weight3.1 Kg
Included AccessoriesPower cable Quick Start Guide Remote control incl. batteries User manual (CD)
Warranty36 months Carry-in or 10000 h
Lens Ratio Category GroupStandard Throw (1 - 3:1)
EB-U50

Further details for this product, EB-U50, can be found at the manufacturer website. Please note, these web addresse(s) are supplied by 3rd parties, Quzo UK is not responsible for the content.

EB-U50

Epson EB-U50. Projector brightness: 3700 ANSI lumens, Projection technology: 3LCD, Projector native resolution: WUXGA (1920x1200). Light source type: Lamp, Service life of light source: 10000 h, Service life of light source (economic mode): 17000 h. Focal length range: 20.42 - 24.5 mm. Serial interface type: RS-232C. Noise level: 37 dB, Noise level (economic mode): 28 dB

Warranty information: 36 months Carry in or 10,000 h, Lamp: 12 months or 1,000 h

Initial Release Date: 01/07/2019

Read more »

Epson EB-U50 V11H952041 Specifications

Product Type Data Projectors Brand Epson Collection Model Epson V11H952041 Collection Model Epson EB-U50 Manufacturer Product Type Epson Data Projectors Market positioning Portable Product colour White Product Family V11H952041 Product Family EB-U50 Contrast ratio (typical) 16000:1 Native aspect ratio 16:10 Connectivity technology Wireless HDMI ports quantity 2 USB 2.0 ports quantity 2 VGA (D-Sub) ports quantity 2 Audio (L/R) in 2 Audio (L/R) out 1 Serial interface type RS-232C USB 2.0 Type-B ports quantity 1 Projector brightness 3700 ANSI lumens Projection technology LCD Projection technology 3LCD Projector native resolution WUXGA (1920x1200) Projection distance 1.1 - 11 m Projection distance (wide) 0.9 - 9 m Projector brightness (economic mode) 2400 ANSI lumens Lamp power 200 W Light source type Lamp Service life of light source 10000 h Service life of light source (economic mode) 17000 h Focal length range (f-f) 20.42 - 24.5 mm Focal length range 20.42 - 24.5 mm Power source AC Power consumption (economy mode) 218 W Power consumption (standby) 0.3 W Power consumption (typical) 285 W AC Input Voltage 100 - 240 V AC input frequency 50 - 60 Hz Width 364 mm Weight 3.1 kg Depth 87 mm Height 248 mm Full HD Yes Year 2019 Year 2020 Noise level 37 dB Noise level (economic mode) 28 dB Lamp Type UHE Harmonized System (HS) code 85286200 Storage temperature (T-T) -10 - 60 C Operating temperature (T-T) 5 - 40 C Colour of product White Connectivity Wireless MPN V11H952041

Epson EB-U50 Downloads

Epson EB-U50 Information Leaflet

Epson EB-U50 V11H952041 Reviews

There are no reviews for this product.

Frequently Asked Questions

Ask a question

You can ask a question about this particular product and we will email you the answer. The answer will then be posted here to assist other shoppers. Click here to ask a question about this product.

There has been no questions asked about this product.
🎁 Win £100 + Unlock Cashback Deals